ECCI
    • Colecciones
    • Autores
    • Títulos
    • Fechas
    • Materias
    • español
    • English
  • Directrices del repositorio 
    • Guía autoarchivo
  • English 
    • español
    • English
  • Login
  • icono-colecciones Na v egar por colecciones
  • icono-autores Na v egar por autores
  • icono-titulos Na v egar por títulos
  • icono-fechas Na v egar por fechas
  • icono-materias Na v egar por materias

Envíos recientes

    No hay artículos recientes
View Item 
  •   DSpace Home
  • E. POSGRADOS
  • EG. Especialización en Gerencia de Mantenimiento
  • EGA. Tesis
  • View Item
  •   DSpace Home
  • E. POSGRADOS
  • EG. Especialización en Gerencia de Mantenimiento
  • EGA. Tesis
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Cambiar vista

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsResource TypeThis CollectionBy Issue DateAuthorsTitlesSubjectsResource Type

My Account

LoginRegister

Statistics

View Usage Statistics

Propuesta de un plan de mantenimiento PMO para la bomba centrífuga mcm series 178 de 15 hp 4x3 para la empresa PSC ENERGY


Cuervo Rodríguez Julián David
Cruz Álvarez Nelson Farid

Trabajo de grado - Especialización

Propuesta, PMO, Bomba Centrífuga MCM, Aplicación.Buscar en Metarevistas
Proposal, PMO, Centrifugal Pump MCM, Application.Buscar en Metarevistas

2021-01-24

The objective of this research was to develop a proposal for the optimization of a maintenance plan (PMO) for a 15 hp 4x3 MCM series 178 centrifugal pump for PSC Energy, which has presented failures in its internal components, resulting in delays in the loading of fluid in tanks and vehicles located in the different fronts of field work that were operated during 2019. All technical and historical equipment management information was diagnosed and established, such as resumes, indicators, formats, failure reports and surface well test inspections. With the above information and the execution of the correct analysis methods, we were able to identify the components with the highest risk of equipment criticality, the pump components were cascaded, the failure effect modes of the most critical components were identified and analyzed through the Pareto diagram, and additionally the life cycle benefit was predicted along with the unavailability cost and ROI calculation. These activities were carried out over a period of 10 months in the facilities of the company PSC energy located in Chia Cundinamarca. During the development of the PMO methodology, the activities described in the research methodology were fulfilled, which were of great importance in the development and adequate implementation of effective maintenance actions and adequate frequencies of the asset.

https://repositorio.ecci.edu.co/handle/001/763

  • EGA. Tesis [64]

Descripción: Propuesta para la Aplicación de PMO en una Bomba Centrífuga.pdf
Título: Propuesta para la Aplicación de PMO en una Bomba Centrífuga.pdf
Tamaño: 2.379Mb

Unicordoba LogoPDFOpen AccessUnicordoba LogoLEER EN FLIP

Descripción: Cesión de derechos.pdf
Título: Cesión de derechos.pdf
Tamaño: 584.6Kb

Unicordoba LogoPDFClosed Access

Descripción: Correo de Universidad ECCI - Cierre proceso de opción de grado.pdf
Título: Correo de Universidad ECCI - Cierre proceso de opción de grado.pdf
Tamaño: 132.9Kb

Unicordoba LogoPDFClosed Access

Show full item record

Thumbnail

Thumbnail

Gestores Bibliograficos

Exportar a Bibtex

Exportar a RIS

Exportar a Excel

Buscar en google Schoolar

Buscar en microsoft academic

untranslated

Código QR
Sistema DSPACE - Metabiblioteca | Metabiblioteca