ECCI
    • Colecciones
    • Autores
    • Títulos
    • Fechas
    • Materias
    • español
    • English
  • Directrices del repositorio 
    • Guía autoarchivo
  • English 
    • español
    • English
  • Login

Repositorio Institucional

  • icono-colecciones Na v egar por colecciones
  • icono-autores Na v egar por autores
  • icono-titulos Na v egar por títulos
  • icono-fechas Na v egar por fechas
  • icono-materias Na v egar por materias
  • icono-colecciones Na v egar por tipo de material

Envíos recientes

    No hay artículos recientes
Image
Image
Image
Image
Image
Image
Image
‹›
View Item 
  •   DSpace Home
  • E. POSGRADOS
  • EG. Especialización en Gerencia de Mantenimiento
  • EGA. Tesis
  • View Item
  •   DSpace Home
  • E. POSGRADOS
  • EG. Especialización en Gerencia de Mantenimiento
  • EGA. Tesis
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Cambiar vista

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsResource TypeThis CollectionBy Issue DateAuthorsTitlesSubjectsResource Type

My Account

LoginRegister

Statistics

View Usage Statistics

Propuesta de un plan de mantenimiento preventivo al compresor de aire doble tornillo humedecido de la empresa Los Coches Megacentro


Guacaneme Ubaque, Adolfo Enrique

Trabajo de grado - Especialización

MantenimientoBuscar en Metarevistas
Máquina herramientaBuscar en Metarevistas
Equipos e instalacionesBuscar en Metarevistas
Instalación industrialBuscar en Metarevistas
MaintenanceBuscar en Metarevistas
Machine toolBuscar en Metarevistas
Equipment and facilitiesBuscar en Metarevistas
Industrial facilityBuscar en Metarevistas

2015

This project is based on making a proposal of preventive maintenance for a double wet screw compressor, which is located on the premises of the company cars Mega headquarters service center, second floor savannah. This compressor neuralgic supplies compressed air to the use of pneumatic tools, which are used to perform preventive and corrective maintenance, sheet and painting based vehicles of Ford, Chevrolet, Renault, Volkswagen brands. Currently this compressor blade no proper preventive maintenance, or predictive, the team will fail every period of about eight months, the failure is not the same as previous picture this creates a difficult diagnosis to predict and parties concerned generated more serious damage to the unit because there is no maintenance to ensure perfect operation. The objective to be achieved with this proposed preventive maintenance is to take a stricter maintenance for the equipment to reach failure and achieve proper route to reduce errors and ensure the reliability and dependability of the affected computer control. Obtaining an improved quality time and work in customer vehicles and protecting the pneumatic machines that work with this compressed air generated by the air compressor.

https://repositorio.ecci.edu.co/handle/001/209

  • EGA. Tesis [142]

Descripción: Trabajo de grado.pdf
Título: Trabajo de grado.pdf
Tamaño: 885.9Kb

Unicordoba LogoPDFOpen AccessUnicordoba LogoLEER EN FLIP

Descripción: FR-GME-03 Formato de Cesión de derechos.png
Título: FR-GME-03 Formato de Cesión de derechos.png
Tamaño: 721.5Kb

FR-GME-03 Formato de Cesión de derechos.pngClosed Access


Show full item record

Miniatura

Thumbnail

Gestores Bibliográficos

Exportar a Bibtex

Exportar a RIS

Exportar a Excel

Buscar en google Schoolar

Buscar en microsoft academic

untranslated

Código QR

Convenios

Articulación e Inclusión

Noticias

Aspirantes

Contáctenos

Costos y formas de pago

Editorial ECCI

Sedes

Padres de familia

Reglamento de Trabajo

Portal de trabajo

Preguntas Frecuentes

Dependencias

Términos y condiciones

Vídeos tutoriales

logo EcciCertificaciones

PBX: (57 1) 3 53 71 71

info@ecci.edu.co

Dirección: Carrera 19 No. 49 – 20 Bogotá, Colombia - Sede Principal

Sistema DSPACE - Metabiblioteca | Metabiblioteca