ECCI
    • Colecciones
    • Autores
    • Títulos
    • Fechas
    • Materias
    • español
    • English
  • Directrices del repositorio 
    • Guía autoarchivo
  • English 
    • español
    • English
  • Login

Repositorio Institucional

  • icono-colecciones Na v egar por colecciones
  • icono-autores Na v egar por autores
  • icono-titulos Na v egar por títulos
  • icono-fechas Na v egar por fechas
  • icono-materias Na v egar por materias
  • icono-colecciones Na v egar por tipo de material

Envíos recientes

    No hay artículos recientes
Image
Image
Image
Image
Image
Image
Image
‹›
View Item 
  •   DSpace Home
  • E. POSGRADOS
  • EG. Especialización en Gerencia de Mantenimiento
  • EGA. Tesis
  • View Item
  •   DSpace Home
  • E. POSGRADOS
  • EG. Especialización en Gerencia de Mantenimiento
  • EGA. Tesis
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Cambiar vista

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsResource TypeThis CollectionBy Issue DateAuthorsTitlesSubjectsResource Type

My Account

LoginRegister

Statistics

View Usage Statistics

Desarrollo de una propuesta basada en la metodología PMO para las unidades de bombeo mecánico de extracción de crudo


Ruiz Llorente, Niyiseth
Carrero Moreno, Jackson José
Carrillo Sierra, Michael Liroy

Trabajo de grado - Especialización

MantenimientoBuscar en Metarevistas
Interacción hombre-máquinaBuscar en Metarevistas
Industria petroleraBuscar en Metarevistas
MetodologíaBuscar en Metarevistas
MaintenanceBuscar en Metarevistas
Human-machine interactionBuscar en Metarevistas
Oil industryBuscar en Metarevistas
MethodologyBuscar en Metarevistas

2020

Two thirds of the wells worldwide are operated by means of Mechanical Pumping, which makes it relevant to maintain the BMU associated with the procurement and production of crude oil, this project is being developed in Field A. Approximately 692 Units were analyzed, which present a number of constant failures and breakdowns that prompted the project of a maintenance proposal based on a PMO; For the development, initially an internal consultancy was prepared and executed, so that the current situation of the maintenance department and its deviations could be known, in order to establish a maintenance methodology, and finally and taking into account the chosen strategy, define activities that guarantee the availability of equipment and the continuous progress of maintenance management.

https://repositorio.ecci.edu.co/handle/001/624

  • EGA. Tesis [142]

Descripción: Trabajo de grado.pdf
Título: Trabajo de grado.pdf
Tamaño: 772.6Kb

Unicordoba LogoPDFOpen AccessUnicordoba LogoLEER EN FLIP

Descripción: FR-GME-03 Formato de Cesión de derechos.pdf
Título: FR-GME-03 Formato de Cesión de derechos.pdf
Tamaño: 428.7Kb

Unicordoba LogoPDFClosed Access

Show full item record

Miniatura

Thumbnail

Gestores Bibliográficos

Exportar a Bibtex

Exportar a RIS

Exportar a Excel

Buscar en google Schoolar

Buscar en microsoft academic

untranslated

Código QR

Convenios

Articulación e Inclusión

Noticias

Aspirantes

Contáctenos

Costos y formas de pago

Editorial ECCI

Sedes

Padres de familia

Reglamento de Trabajo

Portal de trabajo

Preguntas Frecuentes

Dependencias

Términos y condiciones

Vídeos tutoriales

logo EcciCertificaciones

PBX: (57 1) 3 53 71 71

info@ecci.edu.co

Dirección: Carrera 19 No. 49 – 20 Bogotá, Colombia - Sede Principal

Sistema DSPACE - Metabiblioteca | Metabiblioteca